front page lofts

helen contact background
/
/
Front Page Lofts
PROJECT LOCATIONSt. Louis, MO
GENERAL CONTRACTORPinnacle Contracting, Inc
CONTRACTORD&L Painting & Drywall LLC
ARCHITECTE & A Architecture
OTHER DETAILS51 Units; 3 Floors of Commercial Space; 129,175 Sqft

Front Page Lofts

Apartments + Commercial Space

The historic Centennial building in St. Louis was transformed into Front Page Lofts, a modern apartment complex. D&L Painting & Drywall, tasked with the drywall work, sought innovative solutions to meet fire code requirements efficiently.  

The contractor opted for Fire Bead, a fire-resistant deflection bead. This product simplified the process by combining firestopping and drywall finishing into a single step. Unlike traditional methods requiring multiple steps and materials, Fire Bead offered a time-saving and cost-effective solution.  

The D&L team quickly adapted to using Fire Bead, enhancing efficiency and reducing labor costs. The product’s compatibility with concrete ceilings and the building’s low seismic risk made it an ideal choice.

While the project faced challenges due to the building’s location and condition, the use of Fire Bead streamlined the drywalling process, contributing to the overall success of the Front Page Lofts renovation.

Featured Product

Fire Bead is a fire-rated wall mount deflection bead that provides 1 hr and 2 hr fire ratings for both dynamic and static joints. Fire ratings apply to both standard walls and shaft walls and are in accordance with UL-2079 5th edition. Fire bead is also sound tested according to ASTM E90.

Related Projects